Job Profile: Manhole Installation in Cosham, Portsmouth

Manhole Installation in Cosham

Table of Contents

Project Overview:

This project involved the installation of a new manhole and pipework in Cosham, Portsmouth, as part of a water board connection for Southern Water. The installation utilized vitrified clay pipe materials, recognized for their durability and strength, ensuring a long-lasting solution for the drainage needs of the area.

Key Details:

  • Location: Cosham, Portsmouth
  • Client: Southern Water
  • Project Type: Water Board Connection and New Manhole Installation
  • Materials Used: Vitrified Clay Pipework
  • Approval: Installation approved by Southern Water

Scope of Work:

  1. Site Assessment:
    Before installation, our team conducted a thorough assessment of the site to determine the best approach for the manhole and pipework installation. This evaluation ensured compliance with local regulations and Southern Water standards.
  2. Excavation:
    Our skilled operators carefully excavated the designated area to prepare for the new manhole and pipe installation. Special care was taken to minimize disruptions to the surrounding environment and access.
  3. Manhole Installation:
    The manhole was constructed to provide reliable access for future maintenance and inspections. The installation adhered to all safety protocols and industry standards to ensure structural integrity.
  4. Pipe Installation:
    Using high-quality vitrified clay pipes, our team installed the new pipework, ensuring proper alignment and connection to the existing drainage system. Vitrified clay is an ideal material for its resistance to chemical attacks and overall longevity.
  5. Water Board Connection:
    After completing the manhole and pipe installation, we successfully connected the new system to the water board’s infrastructure, ensuring efficient drainage and compliance with Southern Water’s requirements.
  6. Site Restoration:
    Upon completion of the installation, our team restored the site to its original condition, ensuring that all excavated areas were backfilled and compacted properly. We also cleaned the surrounding area to leave it in a safe and tidy state.

Outcome:

This project not only enhances the drainage capabilities of the area but also meets the rigorous standards set by Southern Water. The new manhole and pipe installation are designed to provide long-lasting service, contributing to effective water management in Cosham.

Visual Documentation:

Accompanying this job profile are photos showcasing the installation process, including the excavated site, the newly installed manhole, and the vitrified clay pipework.

For more details on our drainage installation services or to inquire about upcoming projects, please contact Drains24. We are dedicated to providing high-quality drainage solutions that meet the needs of our community.