Deprecated: WPMailSMTP\Providers\Sendlayer\QuickConnectUsage::maybe_flag_limit_reached(): Implicitly marking parameter $connection as nullable is deprecated, the explicit nullable type must be used instead in /home/drains24/public_html/wp-content/plugins/wp-mail-smtp/src/Providers/Sendlayer/QuickConnectUsage.php on line 393 Vitrified Clay Pipe Archives

Work Profile: Flexi Liner Installation in Salisbury

100mm Flexi Liner in Salisbury

Project Overview:Today, our team successfully installed a 100mm flexi liner in Salisbury to address displacements in a 100mm vitrified clay pipe. This innovative solution ensures the integrity of the drainage system while minimizing disruption and excavation. Details of the Job: Scope of Work: Outcome: The installation of the 100mm flexi liner effectively resolved the displacements […]

Job Profile: Manhole Installation in Cosham, Portsmouth

Manhole Installation in Cosham

Project Overview: This project involved the installation of a new manhole and pipework in Cosham, Portsmouth, as part of a water board connection for Southern Water. The installation utilized vitrified clay pipe materials, recognized for their durability and strength, ensuring a long-lasting solution for the drainage needs of the area. Key Details: Scope of Work: […]